Skip to main content
Spodus
  • Pricing
Log inGet a demo

Migrate from Asana

Five columns bind cleanly. Status is not one of them.

Spodus recognises an Asana project export and maps the task name, assignee, dates and project. Sections, notes and tags are left visible rather than guessed at, and there is no status column to read.

Get a demoCompare with Asana

What this move actually is.

Four facts that decide most of the work, before any column is mapped.

The file
One CSV per project. Export project by project rather than in bulk, because a task belonging to several projects exports its project list into a single cell and lands here as one oddly named project.
The preset
Spodus ships an Asana preset built from real Asana exports published in public repositories. It binds Name, Assignee, Due Date, Start Date and Projects, and deliberately leaves the rest alone.
The target
Tasks. The Projects column lands in the task's Project field, which points at Client projects, so turn that object on in Settings if your workspace does not already have it.
The direction
One way, once. There is no sync, so choose a cut-over date, finish what is in flight, and export on the far side of it.

Column by column.

What each Asana column becomes, and what the importer deliberately leaves alone.

Asana columnLands inNotes
Project export, into Tasks
NameTitleThe primary field, and what duplicates are checked on
AssigneeAssigneeMatched against your Spodus roster; a name nobody here holds stays as text and is counted
Due DateDue date
Start DateStart date
ProjectsProjectA link, resolved by name. One value per row if you export per project
Section / ColumnNot a status. It is whatever the project's author typed, so it is left visible rather than guessed at
NotesThe task description. Spodus tasks have no description field
Assignee EmailTasks have no email field. The roster match runs on the display name instead
Task ID, Parent Task, TagsNothing here holds them, so they stay under Ignored columns

Nothing in an Asana export maps to Status, and that is the gap most likely to catch you out. Completed At is a timestamp, not a state, and the preset does not read it. If the done and not-done distinction matters, add a Status column to the sheet before you upload, with values that match your Spodus options, and map it on the Map step. Asana also appends the project's custom fields after the fixed block, so a real file is this list plus columns no preset can name; those stay under Ignored columns where you can map them once the matching Spodus field exists.

What does not come across.

A spreadsheet holds text. Everything below is either not in the export or has no field here to land in.

Descriptions and comments

Notes is the task description and there is no description field on a Spodus task, so it has nowhere to land. Comments and the task's activity story are not part of a CSV export at all.

Sections and boards

A section is whatever the author typed, so it is not translated into a status. Spodus groups tasks by a real select field instead, which means deciding what your sections meant before you import rather than after.

Subtasks

Parent Task exports as an id and nothing in the import fills a parent relationship, so every row arrives as its own task.

Attachments

Files on a task stay in Asana. A CSV holds text, so anything you need here is downloaded and uploaded again by hand.

Portfolios, goals and rules

None of these is in a project export. Spodus has its own Goals and its own automations, and nothing carries across into either.

Dependencies and custom field definitions

Dependencies have no counterpart, and a custom field is a column you can map only once you have created the matching field in Spodus first.

How to do it.

In this order. Steps two and three are the ones people skip and then repeat.

  1. 1

    Export project by project

    A task in two projects exports its projects into one cell, so a bulk export produces rows whose project is literally named after two projects at once. Per-project exports give one clean value per row and cost a few extra minutes.

  2. 2

    Decide what your sections meant

    This is the real work. If your sections were a workflow, add a Status column to the sheet and fill it with values that match the Spodus options. If they were categories, they are a select field you create first. If they were neither, drop them.

  3. 3

    Turn on Client projects

    The Project field on a task points at Client projects. Turn the object on in Settings if it is off. Creating the project records first is optional, since links resolve by name whenever the record arrives.

  4. 4

    Upload and check the mapping

    The Map step should announce an Asana export and bind five columns. Look at what sits under Ignored columns: Notes, Section, Tags and your custom fields will be there, and that list is exactly what you are choosing not to bring.

  5. 5

    Read the preview, then import

    It counts duplicates against your existing tasks, cells it could not read, and links pointing at a project that does not exist yet. Skip duplicates is on by default and automations are off by default.

  6. 6

    Rebuild the views

    Spodus gives tasks table, board, calendar and timeline views. Nothing about an Asana view or rule imports, so set up the two or three you will actually use and stop there.

How long it realistically takes.

Measured in the phases the work actually falls into, including the ones that are not importing.

Exporting a project
2 minutes. One file per project.
Deciding what sections become
30 to 90 minutes. Once for the whole workspace, not per project.
Adding a Status column in the sheet
10 minutes per file. Only if the done distinction matters.
Each project, upload to imported
10 minutes. The preset binds five columns for you.
Rebuilding views
1 to 2 hours. Once, not per project.
Notes, comments, attachments
Not included. None of them has a destination here.

Ten projects is a morning once you have decided what sections mean. A hundred projects is two or three days, and the honest advice is not to move a hundred: move the twenty that are live, archive the rest in Asana, and leave the archive there as a read-only record.

True of any import into Spodus.

The same four rules apply whichever tool you are leaving.

It is a file, not a connection
Spodus reads .csv and .xlsx. Not .xls, which no spreadsheet parser here can open, and not JSON. There is no public API and nothing keeps two systems in step, so what you get is a copy of your data as it stood the moment you exported it.
One file per object
You import into an object, not into the workspace. Open Contacts and import contacts; open Deals and import deals. A vendor that keeps people, companies and deals in three exports needs three passes.
Links are stored as names
A deal points at an account by name, and the link resolves the moment a record with that name exists. So importing accounts before deals is a convenience rather than a rule, and a link that lands unresolved starts working when the missing record arrives.
Nothing is written until you press Import
The preview counts duplicates against the records already in your workspace, counts the cells it could not read, and counts the rows pointing at something that does not exist yet. All three are on screen before the write.

Do not migrate off Asana if:

  • The task description is where the brief lives. Spodus tasks have no description field, so a way of working built on rich task bodies has to change shape here, not just change tool.
  • You run on portfolios, dependencies and workload. Spodus has no resource or capacity planning of any kind and nothing on a timeline blocks anything else.
  • Comments are the record. Task conversations do not export into another product, and a project whose value is its discussion arrives stripped of it.
  • You want the move handled for you. There is no migration service here and no engineer who will do the mapping. It is an export, a spreadsheet and a wizard.

There is no migration service and no engineer here who will do this for you. It is your export, your mapping and your afternoon.

Questions, answered.

Why does the importer ignore my sections?
Because a section is whatever the project's author typed. In one real export it reads In Progress and in another it reads Strategy, and only the first of those is a status in any vocabulary. Binding it to Status would translate cleanly for one project and flag every row of the other, so it stays visible under Ignored columns where you can map it deliberately.
How do tasks get a status then?
Nothing in an Asana export maps to one. Completed At is a timestamp, not a state, and the preset does not read it. Add a Status column to the sheet with values matching your Spodus options and map it on the Map step, which takes a couple of minutes per file in a spreadsheet.
What happens to a task in several projects?
Asana exports the project list into one cell, so the task arrives linked to a single project literally named after both. It is visible and fixable on the record, but the easier answer is to export per project, which is the normal way out of Asana anyway.
Do task descriptions come across?
No. The Notes column holds the description and Spodus tasks have no description field for it, so it stays under Ignored columns. Teams who need the detail usually keep it on the client project record instead.

Coming from something else?

The same page, for the other tools people leave behind.

Kanban boards

Migrate from Trello

Preset mapping, then your decisions.

Read the checklist→

CRM

Migrate from HubSpot

Preset mapping, then your decisions.

Read the checklist→

Work OS

Migrate from monday.com

No preset. Every column mapped by hand.

Read the checklist→

Import a file and see what you get.

Get a demoSign in
Spodus

The all-in-one business suite. CRM, finance, HR, support, and inbox in one seat.

Product

  • CRM
  • Finance
  • HR
  • Support
  • Inbox
  • All products
  • Integrations
  • Pricing

Solutions

  • Agencies
  • IT services
  • Recruiting
  • Consultants
  • Startups
  • Small businesses
  • Professional services
  • B2B services
  • All solutions

Features

  • Connected records
  • Automations
  • Customer portal
  • Roles & permissions
  • Dashboards
  • All features

Compare

  • vs ClickUp
  • vs HubSpot
  • vs Asana
  • vs Zendesk
  • vs monday.com
  • vs Zoho One
  • All comparisons

Alternatives

  • HubSpot alternative
  • monday.com alternative
  • ClickUp alternative
  • Zendesk alternative
  • All alternatives

Migrate

  • From HubSpot
  • From monday.com
  • From ClickUp
  • From Pipedrive
  • From Asana
  • From Trello
  • All migration guides

Company

  • Security
  • Contact

© 2026 Spodus Studios · Operated by Olum LLC.

PrivacyTermsDPASub-processors
Spodus